Standard Operating Procedure for

WSP/WDR Bearing Replacement

 

 

Purpose:    To verify normal operation (incl. data file transfer) and integrity of monitoring equipment, and to collect filter samples.

 

Required Tools:                 

 

Available at site:                                Air duster, DI water, Kim wipes, Latex gloves, Q-tips

                                                Flat-head screwdriver

                                                Un-sampled Teflon filters (37mm)

                                                Teflon tweezers

                                                Traveler sheet for filter samples

                                                Ziploc bags with Petri slides (for sampled filters)                          

 

No procedure at this time.

 

 


CONTACT INFORMATION

 

Main Contact

 

Dr. Karsten Baumann

Atmospheric Research & Analysis, Inc.

 (919) 599-5789

kbaumann@atmospheric-research.com

 

For DAS-Related Emergency Situations

 

Mr. Chad Haker

Atmospheric Research & Analysis, Inc.

730 Avenue F, Suite 220

Plano, TX 75074

(469) 583-4844

chaker@atmospheric-research.com

 

Filter Ship-To Address

 

Mr. Brad Edgerton

Atmospheric Research & Analysis, Inc.

1,000 Perimeter Park Drive, Suite G

Morrisville, NC 27560

(919) 995-0955

bedgerton@atmospheric-research.com

 

 

SRG Site Access

 

Mr. Larry Church

910-449-7733 Office

910-526-9565 Cell

larry.church@usmc.mil

Access key for entrance door on catwalk below porch